This is a small selection of some recent projects which we have undertaken:
| Steel Industry - Oven Turndown Control Scheme | |
| Energy saving scheme to regulate oven
recirculation fan speeds automatically in response to process conditions. |
|
| Commissioning Date: | January 2009 |
| Equipment/Technologies: | ABB ACS800 inverters (12 off), 75kW, profibus comms GE Fanuc Series 90-30 PLC, profibus, ethernet Proficy iFIX SCADA v4.0 and Classic Historian Allen Bradley SLC5/05 PLC, ethernet Gem80 PLC, GemLAN-T, ethernet Bespoke MCC section built and fitted to existing site incomer |
| Services: | Project management, electrical and software design, build, test, installation, cabling and commissioning |
| Chemical Plant - Packing Plant Barcode Labelling & SAP Interface | |
| Barcode labelling and tracking system including an interface to the newly installed SAP system | |
| Commissioning Date: | December 2008 |
| Equipment/Technologies: | Microsoft Visual Studio 2008 Microsoft SQL Server 2008 Express Proficy iFIX SCADA v3.5 Neuro Check v5.1 Industrial Vision Systems software |
| Services: | Project management, software design, test, installation and commissioning |
| Driver Development - Gem80 OPC Driver | |
| Development of OPC driver for Gem80 GemLAN-T to allow read/write access to any data tables without the requirement for additional hardware cards | |
| Driver Release Date: | March 2010 |
| Driver List Price: | Please phone the office for the latest pricing details |
| Equipment/Technologies: | Microsoft Visual Studio 2008 Gem80 GemLAN-T ethernet |
| Services: | Driver software design, development and test |
| Water Park - Recirculation Pump Inverters | |
| Installation and commissioning of inverters to control the speed of the recirculation pumps in order to achieve energy savings | |
| Commissioning Date: | March 2009 |
| Payback Time: | Energy saving payback time < 1 year |
| Equipment/Technologies: | ABB ACS800 inverters (4 off), 15kW, linked with fibre
optic comms ABB Intelligent Pump Control Software to allow multi-pump sequencing |
| Services: | Project management, software design, electrical design, installation, cabling and commissioning |
| Steel Industry - Line Control DC Drives Upgrade | ||
| All line control DC drives upgraded from GEC Gemdrive Analogue to Control Techniques Mentor II - phased scheme to allow production to continue without major outage | ||
| Commissioning Date: | Phased during 2006/2007 | |
| Equipment/Technologies: | Control Techniques Mentor II DC drives (14 off), FLC
ratings from 21.5 to 270 amps Gem80 PLC, GemLAN-T, ethernet Control Techniques CTNet drives communications network |
|
| Services: | - - - - - - |
Project management Drive software design for bridle, tension leveller and recoiler applications Gem80 software re-design for interface to new drive equipment iFIX SCADA and Gem80 Imagem modifications Electrical engineering of new control scheme Build and test of new drive control equipment on backplates Installation, test and commissioning |
| Glass Bottle Manufacturing Plant - Line Control Upgrade | ||
| Redesign of glass bottle line control system to incorporate new layout, distribution, inspection and test equipment | ||
| Commissioning Date: | July 2008 | |
| Equipment/Technologies: | Rockwell Automation RSView32 SCADA Allen Bradley ControlLogix PLCs, ethernet comms Allen Bradley SLC500 PLCs, ethernet comms Allen Bradley PLC5 PLC, Data Highway Plus comms Allen Bradley PowerFlex40 ac drives with DeviceNet comms |
|
| Services: | - - - - - - - |
Project management SCADA software design for new line layout, recipe handling etc PLC software code for new line configuration DeviceNet network configuration, setup and test Electrical control panel build, test and commissioning System installation of cabling, trunking, control panels etc System commissioning within a tight 24 hour downshift window |
| Water Pumping Station - Inverter Upgrade | ||
| Installation and commissioning of 250kW inverter with IGBT active front end rectifier module (for supply harmonic reduction) supplying 2 inverter output modules from a common DC link | ||
| Commissioning Date: | July 2006 | |
| Equipment/Technologies: |
ABB ACS800-14 inverter system, 250kW nominal power, 370A
continuous current, comprising: |
|
| - - - |
1 x ALCL active rectifier module 2 x R8i inverter modules Ancillary busbars, filters, fuses, switchgear etc |
|
| Services: | Project management, system design, installation and
commissioning |
|
Typical Scada screens - iFIX examples


ABB ACS800-14 modular inverter system, 250kW utilising RCS custom
designed frame assembly
Modular inverter system installed on site as a retrofit with minimal
downtime
Typical PLC control panel (Gem80), front and rear views
Custom built MCC section, front and rear views plus internal
detail