Recirculation Pump Inverters – Water Park

About the Project

Installation and commissioning of inverters to control the speed of the recirculation pumps in order to achieve energy savings
Commissioning Date: March 2009
Payback Time: Energy saving payback time < 1 year
Equipment/Technologies: ABB ACS800 inverters (4 off), 15kW, linked with fibre optic comms
ABB Intelligent Pump Control Software to allow multi-pump sequencing
Services:
  • Project management
  • Software design
  • Electrical design
  • Installation
  • Cabling and commissioning